To prepare the state irrigation network for the 2024 growing season, structural units of the Water Resources Service carried out repairs and mechanized cleaning of inter-farm canals with a length of 197.4 kilometres.
Also, 22 hydraulic structures, 5 hydrometric posts, 15 pumping stations were repaired, 2 pumping units were replaced and...