Electric Stations of Kyrgyzstan completes all repair work to prepare for winter

23.10.2020

All repairs have been completed to prepare for the winter, Altynbek Aitikeev, technical director of Electric Stations, said on the air of Birinchi Radio.

As of October 21, the volume of water in the Toktogul reservoir amounted to 15 billion 26 million cubic metres, which is enough to generate electricity.

“We have...