Five small hydroelectric power plants (HPPs) with a total capacity of 41.29 MW were commissioned in the country since the beginning of 2025. This was announced at the Ministry of Energy board meeting.
New small hydropower facilities:
· Aksy HPP: 4.75 MW.
· Boz Uchuk HPP: 5.54 MW.
· Koisa HPP: 9 MW.
· Issyk-Ata HPP 2: 4 MW.
· Kara...